{"id":36980,"date":"2024-10-03T10:08:20","date_gmt":"2024-10-03T14:08:20","guid":{"rendered":"https:\/\/eptura.wpengine.com\/?p=36980"},"modified":"2025-02-19T10:46:59","modified_gmt":"2025-02-19T15:46:59","slug":"need-to-know-bim-for-fm","status":"publish","type":"post","link":"https:\/\/eptura.com\/discover-more\/blog\/need-to-know-bim-for-fm\/","title":{"rendered":"Quick guide for Autodesk University 2024: The need-to-know on BIM for FM"},"content":{"rendered":"<p><span data-contrast=\"auto\">While <a href=\"https:\/\/eptura.com\/discover-more\/blog\/bim-for-fm-the-connection-between-data-and-sustainability\/\">building information modeling (BIM)<\/a> has revolutionized the design, planning, and construction phases of building projects by enhancing collaboration and streamlining processes, there\u2019s been little carryover to operations and maintenance, the two longest and most expensive phases of the life cycle. <\/span><\/p>\n<p><span data-contrast=\"auto\">Within the context of total cost of ownership, that means stakeholders are leaving significant savings on the table.<a href=\"https:\/\/eptura.com\/discover-more\/blog\/bim-for-fm-2\/\"> BIM for facility management (FM)<\/a> ensures more departments can leverage the valuable data from the initial stages throughout the building&#8217;s life cycle, leading to improved operations and maintenance. And with those improvements come lower overall costs.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<p><a href=\"https:\/\/conferences.autodesk.com\/flow\/autodesk\/au2024\/web\/page\/overview\"><span data-contrast=\"none\">Autodesk University 2024<\/span><\/a><span data-contrast=\"auto\">, October 15\u201317 in San Diego, is an opportunity for professionals across disciplines, including architecture, engineering, and construction (AEC), and facility management to learn more about the promises, possibilities, and best practices for BIM for FM. <\/span><\/p>\n<p><span data-contrast=\"auto\">To get the most from the in-person and online sessions, it\u2019s helpful to already have a good working knowledge of BIM for FM, from what it is to the ways you can implement it.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<h2 aria-level=\"2\"><span data-contrast=\"none\">Start with the basics: What is BIM for FM?<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;201341983&quot;:0,&quot;335559738&quot;:160,&quot;335559739&quot;:80,&quot;335559740&quot;:279}\">\u00a0<\/span><\/h2>\n<p><span data-contrast=\"auto\">Conceptually, <a href=\"https:\/\/eptura.com\/discover-more\/blog\/bim-for-fm-the-connection-between-data-and-sustainability\/\">BIM for FM<\/a> is the seventh dimension of BIM. BIM itself is multidimensional, with each dimension adding new sets of data. Starting with 3D modeling, which includes geometrical and graphical data, BIM evolves to include temporal data (4D), financial data (5D), and sustainability data (6D). The highest dimension, 7D, is BIM for FM, which focuses on efficiently operating and maintaining a facility.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<h2 aria-level=\"2\"><span data-contrast=\"none\">Understand what BIM for FM solves: What are the gaps in the facility life cycle?<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;201341983&quot;:0,&quot;335559738&quot;:160,&quot;335559739&quot;:80,&quot;335559740&quot;:279}\">\u00a0<\/span><\/h2>\n<p><span data-contrast=\"auto\">During the first phases, design, planning, and construction, teams generate and share huge data sets, on everything from the architect&#8217;s initial sketches to the model number and shipping information for closet door handles. <\/span><\/p>\n<p><span data-contrast=\"auto\">There\u2019re the dimensions for every wall and the locations of every bit of duct work, plumbing, and electrical wiring inside them. But studies reveal about a third of project data is lost during handover, frustrating facility managers and creating inefficiencies and increased operational costs.\u00a0<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Instead of knowing the exact location, model number, and suggested preventive maintenance program for every asset and piece of equipment, including inspections, tasks, and associated cadences, the facility manager and maintenance team are starting back at square one, forced to track down or make educated guesses.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">BIM for FM helps ensure that the right data is shared with the right people in the right formats, empowering facility managers to make informed decisions, <a href=\"https:\/\/eptura.com\/discover-more\/blog\/what-is-space-optimization\/\">optimize space usage<\/a>, and schedule preventive maintenance effectively. By integrating spatial and geometric data with asset and tenant registers, BIM for FM enhances floor planning, space management, and maintenance scheduling.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<h2 aria-level=\"2\"><span data-contrast=\"none\">Draw the roadmap: What are the steps for BIM for FM implementation?<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;201341983&quot;:0,&quot;335559738&quot;:160,&quot;335559739&quot;:80,&quot;335559740&quot;:279}\">\u00a0<\/span><\/h2>\n<p><span data-contrast=\"auto\">Implementing BIM for FM begins with a discovery phase, where organizations learn about the processes, technologies, and benefits of BIM for FM. Forming a cross-departmental steering committee helps in understanding the current technology matrix and setting future goals. A collaborative approach ensures that the specific needs and challenges of the organization are addressed.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Successful BIM for FM implementation revolves around three core questions:\u00a0<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<ul>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"auto\">Who needs the data?\u00a0<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"auto\">What do they need to do with it?\u00a0<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"auto\">How will you maintain and validate the data?<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-contrast=\"auto\">Answering these questions helps in building a robust data and technology framework that meets the organization&#8217;s operations and maintenance goals.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">For detailed, concrete steps on BIM for FM implementation, download Eptura\u2019s guide <\/span><a href=\"https:\/\/eptura.com\/resource\/guide-bim-for-fm\/\"><span data-contrast=\"none\">BIM for FM: Bridging life cycle gaps is just the beginning<\/span><\/a><span data-contrast=\"auto\">.\u00a0<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<h2 aria-level=\"2\"><span data-contrast=\"none\">Learn from the leaders: What is a real-world BIM for FM success story?<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;201341983&quot;:0,&quot;335559738&quot;:160,&quot;335559739&quot;:80,&quot;335559740&quot;:279}\">\u00a0<\/span><\/h2>\n<p><span data-contrast=\"auto\"><a href=\"https:\/\/eptura.com\/resource\/customer-story-uchealth\/\">UCHealth<\/a>, had been facing significant challenges managing its extensive portfolio of facilities, including inefficient space utilization and maintenance management, which led to increased operational costs and made effective patient care more difficult.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">To address these challenges, <\/span><a href=\"https:\/\/eptura.com\/resource\/customer-story-uchealth\/\"><span data-contrast=\"none\">UCHealth implemented solutions from Autodesk and Archibus<\/span><\/a><span data-contrast=\"auto\">. They wanted better facility management through better data integration and real-time analytics. The program started by creating detailed 3D models of facilities with Autodesk Revit, which helped in accurate space planning and management. The next step was implementing Archibus to streamline maintenance operations by automating workflows and providing comprehensive asset management tools.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\"><a href=\"https:\/\/eptura.com\/resource\/customer-story-uchealth\/\">UCHealth<\/a> has reported significant improvements in operational efficiency, including reduced maintenance costs and better allocation of space, directly contributing to enhanced patient care and staff satisfaction. Implementing Autodesk and Archibus has also provided UCHealth with valuable data-driven insights, allowing for proactive facility management and strategic decision-making.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<h2 aria-level=\"2\"><span data-contrast=\"none\">Eptura panels and presentations at Autodesk University 2024<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;201341983&quot;:0,&quot;335559738&quot;:160,&quot;335559739&quot;:80,&quot;335559740&quot;:279}\">\u00a0<\/span><\/h2>\n<p><span data-contrast=\"auto\">As an <\/span><a href=\"https:\/\/www.autodesk.com\/partners\/aec-partners\/eptura\"><span data-contrast=\"none\">AEC Partner<\/span><\/a><span data-contrast=\"auto\">, Eptura has a long, close relationship with Autodesk, and will be participating in a <\/span><a href=\"https:\/\/conferences.autodesk.com\/flow\/autodesk\/au2024\/sessioncatalog\/page\/inperson?tab.inpersontabs=1718903433346001Ioxt&amp;search=Eptura\"><span data-contrast=\"none\">wide range of events<\/span><\/a><span data-contrast=\"auto\">, including a panel and theater talk as well as sponsoring an industry talk at Autodesk University 2024.\u00a0<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">All the events focus completely or in part on BIM for FM.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<p><a href=\"https:\/\/conferences.autodesk.com\/flow\/autodesk\/au2024\/sessioncatalog\/page\/inperson\/session\/1714516674616001DcLu\"><b><span data-contrast=\"none\">BLD4268<\/span><\/b><\/a><b><span data-contrast=\"auto\"> | From Design and Construction to Operations: The Evolution to Full Digital Handoff<\/span><\/b><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Tuesday, October 15, 3:00 PM &#8211; 4:00 PM PDT<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<ul>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"3\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"auto\">Frederick Kraus, VP Product, Eptura<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"3\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"auto\">Robert Bray, VP &amp; General Manager, Autodesk Tandem, Autodesk<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"3\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"auto\">Nick Stefanidakis, SVP Channel &amp; Strategic Alliances, Eptura<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-contrast=\"auto\">The panel presents a promising vision for building and asset operators using recent worktech innovations to ensure a seamless digital handoff from design and construction to operations.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Weaving together asset details from the building design phase with real-time performance information, the integration between Autodesk Tandem software and Eptura Asset, operations and maintenance teams gain valuable insights to reduce downtime, avoid costly repairs and replacements, and significantly increase productivity.\u00a0<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">With real-world examples and concrete ways to gain access and visibility to asset data across the full building lifecycle, the panel will explore the tangible benefits of digital twins to ensure better planning, decision making, and cost savings.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<p><a href=\"https:\/\/conferences.autodesk.com\/flow\/autodesk\/au2024\/sessioncatalog\/page\/inperson\/session\/1719601698681001BqSW\"><b><span data-contrast=\"none\">TH4910<\/span><\/b><\/a><b><span data-contrast=\"auto\"> | Using AI to \u2018Make Anything\u2019<\/span><\/b><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Wednesday, October 16, 1:30 PM &#8211; 2:30 PM PDT<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<ul>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"4\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"auto\">Meg Swanson, Chief Market Officer, Eptura\u00a0<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"4\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"auto\">VOHO SEO, Senior Designer, Hyundai Motor Co.\u00a0<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"4\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"auto\">Ye Wang, Sr. Principal Research Scientist, Autodesk\u00a0<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"4\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"auto\">Nikola Todorovic, Co-Founder, Wonder Dynamics (formerly Aether, Inc.)\u00a0<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"4\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"auto\">Tye Sheridan, Co-founder and President, Wonder Dynamics, Autodesk<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-contrast=\"auto\">Features short talks on critical themes, from AI and the future of work to business resiliency in a time of digital transformation.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">AI has gone from science fiction trope to a key industry tool in just a few years, with new possibilities emerging all the time. From generatively designed cars to autonomous buildings to push-button VFX that can be used by any filmmaker, discover how AI technologies are fueling new design and make processes and outcomes, redefining collaboration, augmenting creativity, and enabling professionals to work with data in bold new ways.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<p><a href=\"https:\/\/conferences.autodesk.com\/flow\/autodesk\/au2024\/sessioncatalog\/page\/inperson\/session\/1722474691094001v9kw\"><b><span data-contrast=\"none\">BLD5104<\/span><\/b><\/a><b><span data-contrast=\"auto\"> | Beyond the Blueprint: Using Integrated Data for Better Building Management<\/span><\/b><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Thursday, October 17, 10:30 AM &#8211; 11:30 AM PDT<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<ul>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"5\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"auto\">Greg Knight, Senior Product Manager, Eptura\u00a0<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"5\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"auto\">Frederick Kraus, VP Product, Eptura<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-contrast=\"auto\">Enter the evolving connections between BIM and digital twins to see how applications exist beyond the build phase and into operations. Focusing on the seamless integration of Autodesk Tandem and Eptura, the presentation will show how to streamline facility management.\u00a0<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Learn how to:<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<ul>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"9\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"auto\">Adapt these innovations to your specific operational needs<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"9\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"auto\">Gain actionable strategies for effectively leveraging data across a building portfolio<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"9\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"auto\">Ensure these technologies are accessible<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-contrast=\"auto\">Plus, real-world case studies that illustrate successful applications during various operational stages.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<p><a href=\"https:\/\/conferences.autodesk.com\/flow\/autodesk\/au2024\/sessioncatalog\/page\/inperson\/session\/1714421453601001yoQq\"><b><span data-contrast=\"none\">BLD3056<\/span><\/b><\/a><b><span data-contrast=\"auto\"> | Weaving a Digital Thread for Smarter Facilities<\/span><\/b><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:1,&quot;335551620&quot;:1,&quot;335557856&quot;:16777215,&quot;335559738&quot;:150,&quot;335559739&quot;:180,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Thursday, October 17, 4:30 PM &#8211; 5:30 PM PDT<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<ul>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"7\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"auto\">Andrew Burg, Vice President, Messer Construction\u00a0<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"7\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"auto\">Marius Jablonskis, Digital Transformation Leader, Norconsult ASA\u00a0<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"7\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"auto\">Susan Clarke, Sr. Manager, Building Operations Strategy, Autodesk\u00a0<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"7\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"auto\">Nick Stefanidakis, SVP Channel &amp; Strategic Alliances, Eptura\u00a0<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"7\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"auto\">Siva Koppula, Customer Success Manager, Autodesk<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-contrast=\"auto\">Discover the \u201cdigital thread,\u201d an emerging concept in the architecture, engineering, construction, and operations (AECO) industry.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">With the shift toward using digital workflows to track assets through their full lifecycles, there\u2019s a growing recognition that improved data sharing and collaboration are increasingly important when confronting new efficiency and sustainability challenges.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Learn how to start your digital thread with insights from a panel of industry experts with backgrounds in facilities, geographic information systems (GIS), and technology.\u00a0<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<h2 aria-level=\"2\"><span data-contrast=\"none\">Connect with Eptura at Autodesk University 2024<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;201341983&quot;:0,&quot;335559738&quot;:160,&quot;335559739&quot;:80,&quot;335559740&quot;:279}\">\u00a0<\/span><\/h2>\n<p><span data-contrast=\"auto\">We\u2019d love to connect with you, so make sure to join Eptura at <\/span><a href=\"https:\/\/conferences.autodesk.com\/flow\/autodesk\/au2024\/exhibitorcatalog\/page\/catalog\/exhibitor\/1686668796347001DIsa\"><span data-contrast=\"none\">booth 144<\/span><\/a><span data-contrast=\"auto\"> to learn more about our integrated, cloud-based worktech platform packed with features for workplace, facility, and maintenance management. It\u2019s your opportunity to connect with the only market leader with a unified platform and learn how Autodesk Tandem and Eptura <\/span><a href=\"https:\/\/intandem.autodesk.com\/resource\/eptura\/\"><span data-contrast=\"none\">enhance BIM and digital twins<\/span><\/a><span data-contrast=\"auto\"> for facility owners.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>To get the most from the in-person and online sessions, it\u2019s helpful to already have a good working knowledge of BIM for FM, from what it is to the ways you can implement it.\u00a0<\/p>\n","protected":false},"author":26,"featured_media":36982,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","inline_featured_image":false,"footnotes":"","_wpscp_schedule_draft_date":"","_wpscp_schedule_republish_date":"","_wpscppro_advance_schedule":false,"_wpscppro_advance_schedule_date":"","_wpscppro_dont_share_socialmedia":null,"_wpscppro_custom_social_share_image":0,"_facebook_share_type":"default","_twitter_share_type":"default","_linkedin_share_type":"default","_pinterest_share_type":"default","_linkedin_share_type_page":"","_instagram_share_type":"default","_medium_share_type":"","_threads_share_type":"","_google_business_share_type":"","_selected_social_profile":[],"_wpsp_enable_custom_social_template":false,"_wpsp_social_scheduling":{"enabled":false,"datetime":null,"platforms":[],"status":"template_only","dateOption":"today","timeOption":"now","customDays":"","customHours":"","customDate":"","customTime":"","schedulingType":"absolute"},"_wpsp_active_default_template":true},"categories":[347,7],"tags":[419,361],"class_list":["post-36980","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-asset-management","category-blog","tag-blog","tag-eptura"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.5 (Yoast SEO v26.5) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Quick guide for Autodesk University 2024: The need-to-know on BIM for FM<\/title>\n<meta name=\"description\" content=\"It\u2019s helpful to already have a good working knowledge of BIM for FM, from what it is to the ways you can implement it.I\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/eptura.com\/discover-more\/blog\/need-to-know-bim-for-fm\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Quick guide for Autodesk University 2024: The need-to-know on BIM for FM\" \/>\n<meta property=\"og:description\" content=\"It\u2019s helpful to already have a good working knowledge of BIM for FM, from what it is to the ways you can implement it.I\" \/>\n<meta property=\"og:url\" content=\"https:\/\/eptura.com\/discover-more\/blog\/need-to-know-bim-for-fm\/\" \/>\n<meta property=\"og:site_name\" content=\"Eptura\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/EpturaWork\/\" \/>\n<meta property=\"article:published_time\" content=\"2024-10-03T14:08:20+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-02-19T15:46:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/10\/Untitled-design-61.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Jonathan Davis\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@epturawork\" \/>\n<meta name=\"twitter:site\" content=\"@epturawork\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jonathan Davis\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":[\"Article\",\"BlogPosting\"],\"@id\":\"https:\/\/eptura.com\/discover-more\/blog\/need-to-know-bim-for-fm\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/eptura.com\/discover-more\/blog\/need-to-know-bim-for-fm\/\"},\"author\":{\"name\":\"Jonathan Davis\",\"@id\":\"https:\/\/eptura.com\/#\/schema\/person\/2e140d3d2f77b87152b5e2ba941b9158\"},\"headline\":\"Quick guide for Autodesk University 2024: The need-to-know on BIM for FM\",\"datePublished\":\"2024-10-03T14:08:20+00:00\",\"dateModified\":\"2025-02-19T15:46:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/eptura.com\/discover-more\/blog\/need-to-know-bim-for-fm\/\"},\"wordCount\":1385,\"publisher\":{\"@id\":\"https:\/\/eptura.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/eptura.com\/discover-more\/blog\/need-to-know-bim-for-fm\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/10\/Untitled-design-61.webp\",\"keywords\":[\"Blog\",\"eptura\"],\"articleSection\":[\"Asset Management\",\"Blog\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/eptura.com\/discover-more\/blog\/need-to-know-bim-for-fm\/\",\"url\":\"https:\/\/eptura.com\/discover-more\/blog\/need-to-know-bim-for-fm\/\",\"name\":\"Quick guide for Autodesk University 2024: The need-to-know on BIM for FM\",\"isPartOf\":{\"@id\":\"https:\/\/eptura.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/eptura.com\/discover-more\/blog\/need-to-know-bim-for-fm\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/eptura.com\/discover-more\/blog\/need-to-know-bim-for-fm\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/10\/Untitled-design-61.webp\",\"datePublished\":\"2024-10-03T14:08:20+00:00\",\"dateModified\":\"2025-02-19T15:46:59+00:00\",\"description\":\"It\u2019s helpful to already have a good working knowledge of BIM for FM, from what it is to the ways you can implement it.I\",\"breadcrumb\":{\"@id\":\"https:\/\/eptura.com\/discover-more\/blog\/need-to-know-bim-for-fm\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/eptura.com\/discover-more\/blog\/need-to-know-bim-for-fm\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/eptura.com\/discover-more\/blog\/need-to-know-bim-for-fm\/#primaryimage\",\"url\":\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/10\/Untitled-design-61.webp\",\"contentUrl\":\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/10\/Untitled-design-61.webp\",\"width\":1200,\"height\":800},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/eptura.com\/discover-more\/blog\/need-to-know-bim-for-fm\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/eptura.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Quick guide for Autodesk University 2024: The need-to-know on BIM for FM\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/eptura.com\/#website\",\"url\":\"https:\/\/eptura.com\/\",\"name\":\"Eptura\",\"description\":\"Work your world\",\"publisher\":{\"@id\":\"https:\/\/eptura.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/eptura.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/eptura.com\/#organization\",\"name\":\"Eptura\",\"url\":\"https:\/\/eptura.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/eptura.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/03\/eptura-dark-svg-TM-8.png\",\"contentUrl\":\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/03\/eptura-dark-svg-TM-8.png\",\"width\":1280,\"height\":800,\"caption\":\"Eptura\"},\"image\":{\"@id\":\"https:\/\/eptura.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/EpturaWork\/\",\"https:\/\/x.com\/epturawork\",\"https:\/\/www.linkedin.com\/company\/eptura\/\",\"https:\/\/twitter.com\/epturawork\",\"https:\/\/www.youtube.com\/channel\/UC6hdVbsn41BZxfIYmPUdCWQ\"],\"description\":\"A global worktech company that provides software solutions for workplaces, people, and assets that enable everyone to reach their full potential.\",\"legalName\":\"Eptura\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/eptura.com\/#\/schema\/person\/2e140d3d2f77b87152b5e2ba941b9158\",\"name\":\"Jonathan Davis\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/eptura.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/02\/jonathan_davis-96x96.png\",\"contentUrl\":\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/02\/jonathan_davis-96x96.png\",\"caption\":\"Jonathan Davis\"},\"description\":\"As a content creator at Eptura, Jonathan Davis covers asset management, maintenance software, and SaaS solutions, delivering thought leadership with actionable insights across industries such as fleet, manufacturing, healthcare, and hospitality. Jonathan\u2019s writing focuses on topics to help enterprises optimize their operations, including building lifecycle management, digital twins, BIM for facility management, and preventive and predictive maintenance strategies. With a master's degree in journalism and a diverse background that includes writing textbooks, editing video game dialogue, and teaching English as a foreign language, Jonathan brings a versatile perspective to his content creation.\",\"sameAs\":[\"https:\/\/www.linkedin.com\/in\/jonathan-t-davis\/\"],\"jobTitle\":\"Senior Content Writer\",\"worksFor\":\"Eptura\",\"url\":\"https:\/\/eptura.com\/discover-more\/blog\/author\/jonathan-davis\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Quick guide for Autodesk University 2024: The need-to-know on BIM for FM","description":"It\u2019s helpful to already have a good working knowledge of BIM for FM, from what it is to the ways you can implement it.I","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/eptura.com\/discover-more\/blog\/need-to-know-bim-for-fm\/","og_locale":"en_US","og_type":"article","og_title":"Quick guide for Autodesk University 2024: The need-to-know on BIM for FM","og_description":"It\u2019s helpful to already have a good working knowledge of BIM for FM, from what it is to the ways you can implement it.I","og_url":"https:\/\/eptura.com\/discover-more\/blog\/need-to-know-bim-for-fm\/","og_site_name":"Eptura","article_publisher":"https:\/\/www.facebook.com\/EpturaWork\/","article_published_time":"2024-10-03T14:08:20+00:00","article_modified_time":"2025-02-19T15:46:59+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/eptura.com\/wp-content\/uploads\/2024\/10\/Untitled-design-61.webp","type":"image\/webp"}],"author":"Jonathan Davis","twitter_card":"summary_large_image","twitter_creator":"@epturawork","twitter_site":"@epturawork","twitter_misc":{"Written by":"Jonathan Davis","Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":["Article","BlogPosting"],"@id":"https:\/\/eptura.com\/discover-more\/blog\/need-to-know-bim-for-fm\/#article","isPartOf":{"@id":"https:\/\/eptura.com\/discover-more\/blog\/need-to-know-bim-for-fm\/"},"author":{"name":"Jonathan Davis","@id":"https:\/\/eptura.com\/#\/schema\/person\/2e140d3d2f77b87152b5e2ba941b9158"},"headline":"Quick guide for Autodesk University 2024: The need-to-know on BIM for FM","datePublished":"2024-10-03T14:08:20+00:00","dateModified":"2025-02-19T15:46:59+00:00","mainEntityOfPage":{"@id":"https:\/\/eptura.com\/discover-more\/blog\/need-to-know-bim-for-fm\/"},"wordCount":1385,"publisher":{"@id":"https:\/\/eptura.com\/#organization"},"image":{"@id":"https:\/\/eptura.com\/discover-more\/blog\/need-to-know-bim-for-fm\/#primaryimage"},"thumbnailUrl":"https:\/\/eptura.com\/wp-content\/uploads\/2024\/10\/Untitled-design-61.webp","keywords":["Blog","eptura"],"articleSection":["Asset Management","Blog"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/eptura.com\/discover-more\/blog\/need-to-know-bim-for-fm\/","url":"https:\/\/eptura.com\/discover-more\/blog\/need-to-know-bim-for-fm\/","name":"Quick guide for Autodesk University 2024: The need-to-know on BIM for FM","isPartOf":{"@id":"https:\/\/eptura.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/eptura.com\/discover-more\/blog\/need-to-know-bim-for-fm\/#primaryimage"},"image":{"@id":"https:\/\/eptura.com\/discover-more\/blog\/need-to-know-bim-for-fm\/#primaryimage"},"thumbnailUrl":"https:\/\/eptura.com\/wp-content\/uploads\/2024\/10\/Untitled-design-61.webp","datePublished":"2024-10-03T14:08:20+00:00","dateModified":"2025-02-19T15:46:59+00:00","description":"It\u2019s helpful to already have a good working knowledge of BIM for FM, from what it is to the ways you can implement it.I","breadcrumb":{"@id":"https:\/\/eptura.com\/discover-more\/blog\/need-to-know-bim-for-fm\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/eptura.com\/discover-more\/blog\/need-to-know-bim-for-fm\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eptura.com\/discover-more\/blog\/need-to-know-bim-for-fm\/#primaryimage","url":"https:\/\/eptura.com\/wp-content\/uploads\/2024\/10\/Untitled-design-61.webp","contentUrl":"https:\/\/eptura.com\/wp-content\/uploads\/2024\/10\/Untitled-design-61.webp","width":1200,"height":800},{"@type":"BreadcrumbList","@id":"https:\/\/eptura.com\/discover-more\/blog\/need-to-know-bim-for-fm\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/eptura.com\/"},{"@type":"ListItem","position":2,"name":"Quick guide for Autodesk University 2024: The need-to-know on BIM for FM"}]},{"@type":"WebSite","@id":"https:\/\/eptura.com\/#website","url":"https:\/\/eptura.com\/","name":"Eptura","description":"Work your world","publisher":{"@id":"https:\/\/eptura.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/eptura.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/eptura.com\/#organization","name":"Eptura","url":"https:\/\/eptura.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eptura.com\/#\/schema\/logo\/image\/","url":"https:\/\/eptura.com\/wp-content\/uploads\/2024\/03\/eptura-dark-svg-TM-8.png","contentUrl":"https:\/\/eptura.com\/wp-content\/uploads\/2024\/03\/eptura-dark-svg-TM-8.png","width":1280,"height":800,"caption":"Eptura"},"image":{"@id":"https:\/\/eptura.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/EpturaWork\/","https:\/\/x.com\/epturawork","https:\/\/www.linkedin.com\/company\/eptura\/","https:\/\/twitter.com\/epturawork","https:\/\/www.youtube.com\/channel\/UC6hdVbsn41BZxfIYmPUdCWQ"],"description":"A global worktech company that provides software solutions for workplaces, people, and assets that enable everyone to reach their full potential.","legalName":"Eptura"},{"@type":"Person","@id":"https:\/\/eptura.com\/#\/schema\/person\/2e140d3d2f77b87152b5e2ba941b9158","name":"Jonathan Davis","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eptura.com\/#\/schema\/person\/image\/","url":"https:\/\/eptura.com\/wp-content\/uploads\/2024\/02\/jonathan_davis-96x96.png","contentUrl":"https:\/\/eptura.com\/wp-content\/uploads\/2024\/02\/jonathan_davis-96x96.png","caption":"Jonathan Davis"},"description":"As a content creator at Eptura, Jonathan Davis covers asset management, maintenance software, and SaaS solutions, delivering thought leadership with actionable insights across industries such as fleet, manufacturing, healthcare, and hospitality. Jonathan\u2019s writing focuses on topics to help enterprises optimize their operations, including building lifecycle management, digital twins, BIM for facility management, and preventive and predictive maintenance strategies. With a master's degree in journalism and a diverse background that includes writing textbooks, editing video game dialogue, and teaching English as a foreign language, Jonathan brings a versatile perspective to his content creation.","sameAs":["https:\/\/www.linkedin.com\/in\/jonathan-t-davis\/"],"jobTitle":"Senior Content Writer","worksFor":"Eptura","url":"https:\/\/eptura.com\/discover-more\/blog\/author\/jonathan-davis\/"}]}},"_links":{"self":[{"href":"https:\/\/eptura.com\/wp-json\/wp\/v2\/posts\/36980","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eptura.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eptura.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eptura.com\/wp-json\/wp\/v2\/users\/26"}],"replies":[{"embeddable":true,"href":"https:\/\/eptura.com\/wp-json\/wp\/v2\/comments?post=36980"}],"version-history":[{"count":0,"href":"https:\/\/eptura.com\/wp-json\/wp\/v2\/posts\/36980\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eptura.com\/wp-json\/wp\/v2\/media\/36982"}],"wp:attachment":[{"href":"https:\/\/eptura.com\/wp-json\/wp\/v2\/media?parent=36980"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eptura.com\/wp-json\/wp\/v2\/categories?post=36980"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eptura.com\/wp-json\/wp\/v2\/tags?post=36980"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}