{"id":37515,"date":"2024-12-19T08:00:44","date_gmt":"2024-12-19T13:00:44","guid":{"rendered":"https:\/\/eptura.wpengine.com\/?p=37515"},"modified":"2025-02-19T10:46:36","modified_gmt":"2025-02-19T15:46:36","slug":"steps-to-improve-preventive-maintenance","status":"publish","type":"post","link":"https:\/\/eptura.com\/discover-more\/blog\/steps-to-improve-preventive-maintenance\/","title":{"rendered":"Patching a PM program: Concrete steps to improve preventive maintenance"},"content":{"rendered":"<p><span data-contrast=\"auto\">A robust preventive maintenance (PM) program ensures operational efficiency and safety while extending the lifespan of critical assets. By adopting a systematic approach to maintenance, organizations can minimize downtime, reduce costs, and improve overall productivity. But not all PM programs are created equal, and modern maintenance departments need systematic processes for implementing, running, and improving their PM inspections and tasks.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<h2 aria-level=\"2\"><span data-contrast=\"none\">What are the key performance indicators (KPIs) for a preventive maintenance program?<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/h2>\n<p><span data-contrast=\"auto\">Before the maintenance team can improve the PM schedule, they need to track it. And because a PM program touches so many different aspects of operations and maintenance, there are many different related maintenance metrics and KPIs, including:<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<ul>\n<li><b><span data-contrast=\"auto\">Mean time between failures (MTBF)<\/span><\/b><span data-contrast=\"auto\">: Average time between system breakdowns<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li><b><span data-contrast=\"auto\">Planned maintenance percentage (PMP)<\/span><\/b><span data-contrast=\"auto\">: Percentage of maintenance tasks that are planned versus reactive<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:281,&quot;335559739&quot;:281}\">\u00a0<\/span><\/li>\n<li><b><span data-contrast=\"auto\">Preventive maintenance compliance (PMC)<\/span><\/b><span data-contrast=\"auto\">: Percentage of preventive maintenance tasks completed on time<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:281,&quot;335559739&quot;:281}\">\u00a0<\/span><\/li>\n<li><b><span data-contrast=\"auto\">Equipment downtime<\/span><\/b><span data-contrast=\"auto\">: Total time equipment is out of service due to maintenance or failures<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:281,&quot;335559739&quot;:281}\">\u00a0<\/span><\/li>\n<li><b><span data-contrast=\"auto\">Maintenance cost per unit<\/span><\/b><span data-contrast=\"auto\">: Cost of maintenance per piece of equipment or per square foot<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:281,&quot;335559739&quot;:281}\">\u00a0<\/span><\/li>\n<li><b><span data-contrast=\"auto\">Inventory accuracy<\/span><\/b><span data-contrast=\"auto\">: Accuracy of maintenance inventory levels<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:281,&quot;335559739&quot;:281}\">\u00a0<\/span><\/li>\n<li><b><span data-contrast=\"auto\">Emergency work orders<\/span><\/b><span data-contrast=\"auto\">: Number of unplanned or emergency work orders<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:281,&quot;335559739&quot;:281}\">\u00a0<\/span><\/li>\n<li><b><span data-contrast=\"auto\">Mean time to repair (MTTR<\/span><\/b><span data-contrast=\"auto\">): Average time taken to repair equipment<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:281,&quot;335559739&quot;:281}\">\u00a0<\/span><\/li>\n<li><b><span data-contrast=\"auto\">Overall equipment effectiveness (OEE<\/span><\/b><span data-contrast=\"auto\">): Efficiency and effectiveness of equipment<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:281,&quot;335559739&quot;:281}\">\u00a0<\/span><\/li>\n<li><b><span data-contrast=\"auto\">Schedule compliance<\/span><\/b><span data-contrast=\"auto\">: Overall adherence to the preventive maintenance schedule<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:281,&quot;335559739&quot;:281}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-contrast=\"auto\">\u00a0There are also some more general signs of a poorly performing PM program.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<h3 aria-level=\"3\"><span data-contrast=\"none\">Steady maintenance costs<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/h3>\n<p><span data-contrast=\"auto\">One of the easiest ways to see how well your PM program is working is to look at your costs before and after implementation. Look specifically at pre- and post-implementation numbers for labor and unscheduled maintenance. If you don\u2019t see a general decrease, it may mean your PM program isn&#8217;t delivering what it should.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<h3 aria-level=\"3\"><span data-contrast=\"none\">Steady downtime numbers<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/h3>\n<p><span data-contrast=\"auto\">Ideally, an efficient preventive maintenance plan should reduce the amount of unplanned work to less than 20% of the total. If there\u2019s no change in the amount of unscheduled downtime, your preventive maintenance plan isn&#8217;t working the way it should. You can also look at other costs associated with unscheduled downtime. For example, overtime hours for company technicians and emergency calls to third-party vendors. If these numbers are also not decreasing, your program isn&#8217;t working.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<h3 aria-level=\"3\"><span data-contrast=\"none\">Disorganized inventory management<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/h3>\n<p><span data-contrast=\"auto\">Proper inventory management boosts profits by minimizing costs through optimized resource consumption. Inventory management means having the right stock, at the right time, at the right cost. If you find yourself always short of the parts and materials you need and it\u2019s costing you a lot in express shipping, your PM program isn&#8217;t working for you.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<h2 aria-level=\"2\"><span data-contrast=\"none\">How can the maintenance department fix a preventive maintenance program?<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/h2>\n<p><span data-contrast=\"auto\">Because not every program suffers from the same set of problems, not every solution can help. In the end, which of these will work for you depends on why you\u2019re having problems in the first place. You might need to implement only a few changes. But even if there\u2019s more than a few, it\u2019s worth investing the time and budget into getting everything set up properly. An effective PM program delivers a strong ROI, taking a huge weight off the maintenance department\u2019s collective shoulders.\u00a0\u00a0\u00a0<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<h3 aria-level=\"3\"><span data-contrast=\"none\">Take the time to implement the program properly<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/h3>\n<p><span data-contrast=\"auto\">A PM program is only as effective as its implementation. A simple analogy: What do you need to grow the perfect crop? Is it just seeds? That\u2019s an important part of it, but you\u2019ll also need water and fertilizer \u2014 and the time, knowledge, and patience to combine them properly.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">\u00a0So, what are the ingredients for a successful implementation? They\u2019re the same: time, knowledge, and patience.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">First, make sure you allow enough time. Things aren\u2019t going to happen overnight. You and your team will need to give yourselves enough time and resources to implement a modern asset and facility management solution and then set up and schedule the PMs.\u00a0\u00a0<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Second, make sure you have the right knowledge. An enterprise-level technology partner can walk you through the necessary steps to ensure everything is done properly. They should have lots of experience, which means they can help you avoid all the common pitfalls.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<h3 aria-level=\"3\"><span data-contrast=\"none\">Set up PMs based on criticality, age, and work order history<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/h3>\n<p><span data-contrast=\"auto\">Every asset has an important role to play, but some are more important than others, and you need to organize your PMs accordingly.\u00a0<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Asset criticality is a measure of the importance or significance of an asset or piece of equipment to an organization&#8217;s operations. It helps maintenance departments prioritize resources and attention, ensuring that the most crucial assets are maintained and repaired first. To determine asset criticality, maintenance departments can follow a structured process.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-37516\" src=\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/12\/Accurate-up-to-date-tracking-1.webp\" alt=\"\" width=\"800\" height=\"500\" srcset=\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/12\/Accurate-up-to-date-tracking-1.webp 800w, https:\/\/eptura.com\/wp-content\/uploads\/2024\/12\/Accurate-up-to-date-tracking-1-300x188.webp 300w, https:\/\/eptura.com\/wp-content\/uploads\/2024\/12\/Accurate-up-to-date-tracking-1-768x480.webp 768w\" sizes=\"auto, (max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 984px) 61vw, (max-width: 1362px) 45vw, 600px\" \/><\/p>\n<p><span data-contrast=\"auto\">First, identify all assets and their functions within the organization. Then, evaluate each asset based on several factors, including:\u00a0<\/span><span data-ccp-props=\"{&quot;335559685&quot;:0}\">\u00a0<\/span><\/p>\n<ul>\n<li><span data-contrast=\"auto\">Impact on production or operations<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Effects of its failure<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Cost of repair or replacement<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Risks, like safety or environmental risk<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-contrast=\"auto\">Assign a score to each factor and calculate an overall criticality score for each asset.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">By ranking assets based on their importance, maintenance departments can create a hierarchy of importance, helping them allocate resources more efficiently, plan maintenance schedules more efficiently, and reduce downtime for the most important assets. Regularly reviewing and updating asset criticality ensures that the maintenance strategy remains aligned with the organization&#8217;s goals and operational needs.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">But criticality isn\u2019t the only metric. You also need to look at things like age and maintenance and repairs histories. The older a machine is, the more you have to look after it. And assets that have given you problems in the past, they also need more PMs.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<h3 aria-level=\"3\"><span data-contrast=\"none\">Automate the capture of associated data\u00a0<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;201341983&quot;:0,&quot;335551550&quot;:1,&quot;335551620&quot;:1,&quot;335559685&quot;:0,&quot;335559737&quot;:0,&quot;335559738&quot;:160,&quot;335559739&quot;:80,&quot;335559740&quot;:279}\">\u00a0<\/span><\/h3>\n<p><span data-contrast=\"none\">Remember, the power of the PM program comes from its ability to leverage data. So, you need to ensure it\u2019s being regularly updated and that all the data related to maintenance gets into the system. You need to feed the program lots of data so it can produce the right schedules. For example, how do you know when to change the oil in your car? You\u2019re only guessing unless you know:<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<ul>\n<li><span data-contrast=\"auto\">Current mileage and the mileage at the last oil change<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Manufacturer\u2019s recommendations for when to change the oil<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Engine work, both maintenance and repairs, that might affect the oil<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-contrast=\"auto\">Once the PM program is in place, you\u2019ll want to keep checking at regular intervals that the department is capturing the right data. Modern platforms automate much of the process, eliminating the risk of human error.\u00a0<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<h3 aria-level=\"3\"><span data-contrast=\"none\">Keep fine-tuning the PM program as you go along<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/h3>\n<p><span data-contrast=\"auto\">Fine-tuning a preventive maintenance program over time helps ensure its continued effectiveness and alignment with evolving organizational needs. As operations, equipment, and priorities change, so should the maintenance strategies that support them. Regularly reviewing and adjusting the program helps optimize resource allocation, minimize downtime, and extend the lifespan of assets.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">One key aspect of fine-tuning is updating the maintenance schedule based on asset performance data. For instance, if a particular machine is failing more frequently than anticipated, it may be necessary to increase the frequency of its preventive maintenance tasks. But if an asset shows minimal wear and tear, the interval between maintenance tasks can be extended, freeing up resources for more critical areas.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-37517\" src=\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/12\/Effective-control-costs-1.webp\" alt=\"\" width=\"800\" height=\"500\" srcset=\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/12\/Effective-control-costs-1.webp 800w, https:\/\/eptura.com\/wp-content\/uploads\/2024\/12\/Effective-control-costs-1-300x188.webp 300w, https:\/\/eptura.com\/wp-content\/uploads\/2024\/12\/Effective-control-costs-1-768x480.webp 768w\" sizes=\"auto, (max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 984px) 61vw, (max-width: 1362px) 45vw, 600px\" \/><\/p>\n<p><span data-contrast=\"auto\">Consider a manufacturing plant with a conveyor belt system. Initially, the preventive maintenance program might schedule quarterly inspections and lubrication. However, after a year of operation, data analysis reveals that the belts are wearing out faster than expected, leading to increased downtime. By fine-tuning the program to include monthly inspections and more frequent lubrication, the plant can reduce unplanned stoppages and improve overall productivity.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">And incorporating new technologies and best practices can improve the preventive maintenance program. For example, integrating IoT sensors to monitor equipment in real-time can provide early warnings of potential failures, enabling proactive maintenance.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<h3 aria-level=\"3\"><span data-contrast=\"none\">Update all the manuals related to assets and equipment<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/h3>\n<p><span data-contrast=\"auto\">Adding digital manuals and warranties integrated to a preventive maintenance management platform delivers significant value to maintenance teams. First, it centralizes all critical information, making it easily accessible from anywhere at any time, eliminating the need for physical documents that can be misplaced or damaged and ensuring that technicians always have the most up-to-date information.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">And integrating these documents into the platform allows for better tracking and reporting. Maintenance activities can be linked directly to the relevant manuals and warranties, providing a comprehensive history of each asset&#8217;s maintenance and any warranty-related repairs. This not only simplifies audits and compliance but also helps with identifying trends and optimizing maintenance strategies.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:1,&quot;335551620&quot;:1,&quot;335559685&quot;:0,&quot;335559737&quot;:0,&quot;335559738&quot;:240,&quot;335559739&quot;:240,&quot;335559740&quot;:279}\">\u00a0<\/span><\/p>\n<h3 aria-level=\"3\"><span data-contrast=\"none\">Train the maintenance technicians<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/h3>\n<p><span data-contrast=\"auto\">Training maintenance technicians is essential for the success of a preventive maintenance program. Well-trained technicians ensure that maintenance tasks are performed accurately and efficiently, reducing downtime and extending the lifespan of assets.\u00a0<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Training equips technicians with the knowledge and skills to perform diverse maintenance tasks. It helps them understand the specific needs of each asset, follow best practices, and use tools and equipment safely and correctly. This leads to higher-quality work and fewer errors, which can prevent equipment failures and costly repairs.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">And training keeps technicians up to date with the latest technologies and industry standards. As maintenance practices evolve, continuous learning ensures that the team remains competent and capable of handling new challenges.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">To implement effective training:<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<ol>\n<li><b><span data-contrast=\"auto\">Assess skill gaps<\/span><\/b><span data-contrast=\"auto\">: Evaluate the current skills and knowledge of your technicians to identify areas where training is needed most.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/li>\n<li><b><span data-contrast=\"auto\">Tailor training programs<\/span><\/b><span data-contrast=\"auto\">: Develop or source training programs that are specific to the assets and equipment in your facility. Generic training may not cover the unique aspects of your maintenance needs.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/li>\n<li><b><span data-contrast=\"auto\">Use multiple training methods<\/span><\/b><span data-contrast=\"auto\">: Combine classroom training with hands-on workshops, online courses, and on-the-job training to cater to different learning styles.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/li>\n<li><b><span data-contrast=\"auto\">Regular refresher courses<\/span><\/b><span data-contrast=\"auto\">: Schedule periodic refresher courses to reinforce learning and update technicians on any changes in procedures or technologies.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/li>\n<li><b><span data-contrast=\"auto\">Mentorship programs<\/span><\/b><span data-contrast=\"auto\">: Pair new technicians with experienced ones to facilitate knowledge sharing and practical learning.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/li>\n<li><b><span data-contrast=\"auto\">Track progress<\/span><\/b><span data-contrast=\"auto\">: Monitor the effectiveness of training through assessments and performance metrics. Adjust training programs as needed to ensure they are meeting the desired outcomes.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/li>\n<\/ol>\n<p><span data-contrast=\"auto\">By investing in comprehensive and ongoing training, you can build a skilled and confident maintenance team that\u2019s well-prepared to execute a successful preventive maintenance program.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The key to successful training is implementing systems to ensure they don\u2019t lose hard-won maintenance know-how. Implementing a digital maintenance platform offers significant value in preserving tribal knowledge and facilitating knowledge transfer, especially for maintenance departments managing multiple facilities.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-37518\" src=\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/12\/Customizable-checklists-and-instructions-4.webp\" alt=\"\" width=\"800\" height=\"500\" srcset=\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/12\/Customizable-checklists-and-instructions-4.webp 800w, https:\/\/eptura.com\/wp-content\/uploads\/2024\/12\/Customizable-checklists-and-instructions-4-300x188.webp 300w, https:\/\/eptura.com\/wp-content\/uploads\/2024\/12\/Customizable-checklists-and-instructions-4-768x480.webp 768w\" sizes=\"auto, (max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 984px) 61vw, (max-width: 1362px) 45vw, 600px\" \/><\/p>\n<p><span data-contrast=\"auto\">First, a digital platform centralizes maintenance data and history, capturing the expertise and experiences of veteran technicians, ensuring that valuable insights and best practices are not lost with staff turnover or retirement. By documenting procedures, checklists, and troubleshooting guides, the platform retains institutional knowledge, making it accessible to all technicians across different sites.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Second, the platform enables standardization of maintenance processes. With a unified system, all facilities adhere to the same protocols, enhancing consistency and efficiency, which is particularly beneficial for multi-site operations, where disparate practices can lead to inconsistencies and inefficiencies that directly affect your ability to leverage data captured through the PM program.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<h2 aria-level=\"2\"><span data-contrast=\"none\">How can a maintenance department improve a PM program?<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/h2>\n<p><span data-contrast=\"auto\">Improving a preventive maintenance program involves a multifaceted approach that includes tracking and analyzing key performance indicators, assessing asset criticality, making data-driven decisions, and fine-tuning maintenance schedules. <\/span><\/p>\n<p><span data-contrast=\"auto\">The integration of new technologies such as IoT sensors, updating manuals and documentation digitally, and enhancing training for maintenance technicians are also important. By focusing on these areas, maintenance departments can significantly improve the effectiveness of their preventive maintenance programs, leading to improved reliability, cost-efficiency, and asset longevity.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Improving a preventive maintenance program involves a multifaceted approach that includes tracking and analyzing key performance indicators, assessing asset criticality, making data-driven decisions, and fine-tuning maintenance schedules.<\/p>\n","protected":false},"author":26,"featured_media":37521,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","inline_featured_image":false,"footnotes":"","_wpscp_schedule_draft_date":"","_wpscp_schedule_republish_date":"","_wpscppro_advance_schedule":false,"_wpscppro_advance_schedule_date":"","_wpscppro_dont_share_socialmedia":null,"_wpscppro_custom_social_share_image":0,"_facebook_share_type":"default","_twitter_share_type":"default","_linkedin_share_type":"default","_pinterest_share_type":"default","_linkedin_share_type_page":"","_instagram_share_type":"default","_medium_share_type":"default","_threads_share_type":"","_google_business_share_type":"","_selected_social_profile":[],"_wpsp_enable_custom_social_template":false,"_wpsp_social_scheduling":{"enabled":false,"datetime":null,"platforms":[],"status":"template_only","dateOption":"today","timeOption":"now","customDays":"","customHours":"","customDate":"","customTime":"","schedulingType":"absolute"},"_wpsp_active_default_template":true},"categories":[1],"tags":[419,361],"class_list":["post-37515","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-eptura","tag-blog","tag-eptura"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.5 (Yoast SEO v26.5) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Concrete steps to improve preventive maintenance<\/title>\n<meta name=\"description\" content=\"How can a maintenance department improve a preventive maintenance program?\u00a0Analyzing KPI&#039;s, making data-driven decisions, and and more.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/eptura.com\/discover-more\/blog\/steps-to-improve-preventive-maintenance\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Patching a PM program: Concrete steps to improve preventive maintenance\" \/>\n<meta property=\"og:description\" content=\"How can a maintenance department improve a preventive maintenance program?\u00a0Analyzing KPI&#039;s, making data-driven decisions, and and more.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/eptura.com\/discover-more\/blog\/steps-to-improve-preventive-maintenance\/\" \/>\n<meta property=\"og:site_name\" content=\"Eptura\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/EpturaWork\/\" \/>\n<meta property=\"article:published_time\" content=\"2024-12-19T13:00:44+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-02-19T15:46:36+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/12\/Maintenance-engineer-featured.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Jonathan Davis\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@epturawork\" \/>\n<meta name=\"twitter:site\" content=\"@epturawork\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jonathan Davis\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":[\"Article\",\"BlogPosting\"],\"@id\":\"https:\/\/eptura.com\/discover-more\/blog\/steps-to-improve-preventive-maintenance\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/eptura.com\/discover-more\/blog\/steps-to-improve-preventive-maintenance\/\"},\"author\":{\"name\":\"Jonathan Davis\",\"@id\":\"https:\/\/eptura.com\/#\/schema\/person\/2e140d3d2f77b87152b5e2ba941b9158\"},\"headline\":\"Patching a PM program: Concrete steps to improve preventive maintenance\",\"datePublished\":\"2024-12-19T13:00:44+00:00\",\"dateModified\":\"2025-02-19T15:46:36+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/eptura.com\/discover-more\/blog\/steps-to-improve-preventive-maintenance\/\"},\"wordCount\":1941,\"publisher\":{\"@id\":\"https:\/\/eptura.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/eptura.com\/discover-more\/blog\/steps-to-improve-preventive-maintenance\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/12\/Maintenance-engineer-featured.webp\",\"keywords\":[\"Blog\",\"eptura\"],\"articleSection\":[\"Eptura\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/eptura.com\/discover-more\/blog\/steps-to-improve-preventive-maintenance\/\",\"url\":\"https:\/\/eptura.com\/discover-more\/blog\/steps-to-improve-preventive-maintenance\/\",\"name\":\"Concrete steps to improve preventive maintenance\",\"isPartOf\":{\"@id\":\"https:\/\/eptura.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/eptura.com\/discover-more\/blog\/steps-to-improve-preventive-maintenance\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/eptura.com\/discover-more\/blog\/steps-to-improve-preventive-maintenance\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/12\/Maintenance-engineer-featured.webp\",\"datePublished\":\"2024-12-19T13:00:44+00:00\",\"dateModified\":\"2025-02-19T15:46:36+00:00\",\"description\":\"How can a maintenance department improve a preventive maintenance program?\u00a0Analyzing KPI's, making data-driven decisions, and and more.\",\"breadcrumb\":{\"@id\":\"https:\/\/eptura.com\/discover-more\/blog\/steps-to-improve-preventive-maintenance\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/eptura.com\/discover-more\/blog\/steps-to-improve-preventive-maintenance\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/eptura.com\/discover-more\/blog\/steps-to-improve-preventive-maintenance\/#primaryimage\",\"url\":\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/12\/Maintenance-engineer-featured.webp\",\"contentUrl\":\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/12\/Maintenance-engineer-featured.webp\",\"width\":1200,\"height\":800},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/eptura.com\/discover-more\/blog\/steps-to-improve-preventive-maintenance\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/eptura.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Patching a PM program: Concrete steps to improve preventive maintenance\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/eptura.com\/#website\",\"url\":\"https:\/\/eptura.com\/\",\"name\":\"Eptura\",\"description\":\"Work your world\",\"publisher\":{\"@id\":\"https:\/\/eptura.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/eptura.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/eptura.com\/#organization\",\"name\":\"Eptura\",\"url\":\"https:\/\/eptura.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/eptura.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/03\/eptura-dark-svg-TM-8.png\",\"contentUrl\":\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/03\/eptura-dark-svg-TM-8.png\",\"width\":1280,\"height\":800,\"caption\":\"Eptura\"},\"image\":{\"@id\":\"https:\/\/eptura.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/EpturaWork\/\",\"https:\/\/x.com\/epturawork\",\"https:\/\/www.linkedin.com\/company\/eptura\/\",\"https:\/\/twitter.com\/epturawork\",\"https:\/\/www.youtube.com\/channel\/UC6hdVbsn41BZxfIYmPUdCWQ\"],\"description\":\"A global worktech company that provides software solutions for workplaces, people, and assets that enable everyone to reach their full potential.\",\"legalName\":\"Eptura\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/eptura.com\/#\/schema\/person\/2e140d3d2f77b87152b5e2ba941b9158\",\"name\":\"Jonathan Davis\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/eptura.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/02\/jonathan_davis-96x96.png\",\"contentUrl\":\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/02\/jonathan_davis-96x96.png\",\"caption\":\"Jonathan Davis\"},\"description\":\"As a content creator at Eptura, Jonathan Davis covers asset management, maintenance software, and SaaS solutions, delivering thought leadership with actionable insights across industries such as fleet, manufacturing, healthcare, and hospitality. Jonathan\u2019s writing focuses on topics to help enterprises optimize their operations, including building lifecycle management, digital twins, BIM for facility management, and preventive and predictive maintenance strategies. With a master's degree in journalism and a diverse background that includes writing textbooks, editing video game dialogue, and teaching English as a foreign language, Jonathan brings a versatile perspective to his content creation.\",\"sameAs\":[\"https:\/\/www.linkedin.com\/in\/jonathan-t-davis\/\"],\"jobTitle\":\"Senior Content Writer\",\"worksFor\":\"Eptura\",\"url\":\"https:\/\/eptura.com\/discover-more\/blog\/author\/jonathan-davis\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Concrete steps to improve preventive maintenance","description":"How can a maintenance department improve a preventive maintenance program?\u00a0Analyzing KPI's, making data-driven decisions, and and more.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/eptura.com\/discover-more\/blog\/steps-to-improve-preventive-maintenance\/","og_locale":"en_US","og_type":"article","og_title":"Patching a PM program: Concrete steps to improve preventive maintenance","og_description":"How can a maintenance department improve a preventive maintenance program?\u00a0Analyzing KPI's, making data-driven decisions, and and more.","og_url":"https:\/\/eptura.com\/discover-more\/blog\/steps-to-improve-preventive-maintenance\/","og_site_name":"Eptura","article_publisher":"https:\/\/www.facebook.com\/EpturaWork\/","article_published_time":"2024-12-19T13:00:44+00:00","article_modified_time":"2025-02-19T15:46:36+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/eptura.com\/wp-content\/uploads\/2024\/12\/Maintenance-engineer-featured.webp","type":"image\/webp"}],"author":"Jonathan Davis","twitter_card":"summary_large_image","twitter_creator":"@epturawork","twitter_site":"@epturawork","twitter_misc":{"Written by":"Jonathan Davis","Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":["Article","BlogPosting"],"@id":"https:\/\/eptura.com\/discover-more\/blog\/steps-to-improve-preventive-maintenance\/#article","isPartOf":{"@id":"https:\/\/eptura.com\/discover-more\/blog\/steps-to-improve-preventive-maintenance\/"},"author":{"name":"Jonathan Davis","@id":"https:\/\/eptura.com\/#\/schema\/person\/2e140d3d2f77b87152b5e2ba941b9158"},"headline":"Patching a PM program: Concrete steps to improve preventive maintenance","datePublished":"2024-12-19T13:00:44+00:00","dateModified":"2025-02-19T15:46:36+00:00","mainEntityOfPage":{"@id":"https:\/\/eptura.com\/discover-more\/blog\/steps-to-improve-preventive-maintenance\/"},"wordCount":1941,"publisher":{"@id":"https:\/\/eptura.com\/#organization"},"image":{"@id":"https:\/\/eptura.com\/discover-more\/blog\/steps-to-improve-preventive-maintenance\/#primaryimage"},"thumbnailUrl":"https:\/\/eptura.com\/wp-content\/uploads\/2024\/12\/Maintenance-engineer-featured.webp","keywords":["Blog","eptura"],"articleSection":["Eptura"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/eptura.com\/discover-more\/blog\/steps-to-improve-preventive-maintenance\/","url":"https:\/\/eptura.com\/discover-more\/blog\/steps-to-improve-preventive-maintenance\/","name":"Concrete steps to improve preventive maintenance","isPartOf":{"@id":"https:\/\/eptura.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/eptura.com\/discover-more\/blog\/steps-to-improve-preventive-maintenance\/#primaryimage"},"image":{"@id":"https:\/\/eptura.com\/discover-more\/blog\/steps-to-improve-preventive-maintenance\/#primaryimage"},"thumbnailUrl":"https:\/\/eptura.com\/wp-content\/uploads\/2024\/12\/Maintenance-engineer-featured.webp","datePublished":"2024-12-19T13:00:44+00:00","dateModified":"2025-02-19T15:46:36+00:00","description":"How can a maintenance department improve a preventive maintenance program?\u00a0Analyzing KPI's, making data-driven decisions, and and more.","breadcrumb":{"@id":"https:\/\/eptura.com\/discover-more\/blog\/steps-to-improve-preventive-maintenance\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/eptura.com\/discover-more\/blog\/steps-to-improve-preventive-maintenance\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eptura.com\/discover-more\/blog\/steps-to-improve-preventive-maintenance\/#primaryimage","url":"https:\/\/eptura.com\/wp-content\/uploads\/2024\/12\/Maintenance-engineer-featured.webp","contentUrl":"https:\/\/eptura.com\/wp-content\/uploads\/2024\/12\/Maintenance-engineer-featured.webp","width":1200,"height":800},{"@type":"BreadcrumbList","@id":"https:\/\/eptura.com\/discover-more\/blog\/steps-to-improve-preventive-maintenance\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/eptura.com\/"},{"@type":"ListItem","position":2,"name":"Patching a PM program: Concrete steps to improve preventive maintenance"}]},{"@type":"WebSite","@id":"https:\/\/eptura.com\/#website","url":"https:\/\/eptura.com\/","name":"Eptura","description":"Work your world","publisher":{"@id":"https:\/\/eptura.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/eptura.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/eptura.com\/#organization","name":"Eptura","url":"https:\/\/eptura.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eptura.com\/#\/schema\/logo\/image\/","url":"https:\/\/eptura.com\/wp-content\/uploads\/2024\/03\/eptura-dark-svg-TM-8.png","contentUrl":"https:\/\/eptura.com\/wp-content\/uploads\/2024\/03\/eptura-dark-svg-TM-8.png","width":1280,"height":800,"caption":"Eptura"},"image":{"@id":"https:\/\/eptura.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/EpturaWork\/","https:\/\/x.com\/epturawork","https:\/\/www.linkedin.com\/company\/eptura\/","https:\/\/twitter.com\/epturawork","https:\/\/www.youtube.com\/channel\/UC6hdVbsn41BZxfIYmPUdCWQ"],"description":"A global worktech company that provides software solutions for workplaces, people, and assets that enable everyone to reach their full potential.","legalName":"Eptura"},{"@type":"Person","@id":"https:\/\/eptura.com\/#\/schema\/person\/2e140d3d2f77b87152b5e2ba941b9158","name":"Jonathan Davis","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eptura.com\/#\/schema\/person\/image\/","url":"https:\/\/eptura.com\/wp-content\/uploads\/2024\/02\/jonathan_davis-96x96.png","contentUrl":"https:\/\/eptura.com\/wp-content\/uploads\/2024\/02\/jonathan_davis-96x96.png","caption":"Jonathan Davis"},"description":"As a content creator at Eptura, Jonathan Davis covers asset management, maintenance software, and SaaS solutions, delivering thought leadership with actionable insights across industries such as fleet, manufacturing, healthcare, and hospitality. Jonathan\u2019s writing focuses on topics to help enterprises optimize their operations, including building lifecycle management, digital twins, BIM for facility management, and preventive and predictive maintenance strategies. With a master's degree in journalism and a diverse background that includes writing textbooks, editing video game dialogue, and teaching English as a foreign language, Jonathan brings a versatile perspective to his content creation.","sameAs":["https:\/\/www.linkedin.com\/in\/jonathan-t-davis\/"],"jobTitle":"Senior Content Writer","worksFor":"Eptura","url":"https:\/\/eptura.com\/discover-more\/blog\/author\/jonathan-davis\/"}]}},"_links":{"self":[{"href":"https:\/\/eptura.com\/wp-json\/wp\/v2\/posts\/37515","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eptura.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eptura.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eptura.com\/wp-json\/wp\/v2\/users\/26"}],"replies":[{"embeddable":true,"href":"https:\/\/eptura.com\/wp-json\/wp\/v2\/comments?post=37515"}],"version-history":[{"count":0,"href":"https:\/\/eptura.com\/wp-json\/wp\/v2\/posts\/37515\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eptura.com\/wp-json\/wp\/v2\/media\/37521"}],"wp:attachment":[{"href":"https:\/\/eptura.com\/wp-json\/wp\/v2\/media?parent=37515"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eptura.com\/wp-json\/wp\/v2\/categories?post=37515"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eptura.com\/wp-json\/wp\/v2\/tags?post=37515"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}