{"id":9436,"date":"2024-11-22T08:00:23","date_gmt":"2024-11-22T13:00:23","guid":{"rendered":"https:\/\/websitemigration.xyz\/construction-equipment-downtime\/"},"modified":"2025-02-19T10:46:42","modified_gmt":"2025-02-19T15:46:42","slug":"construction-equipment-downtime","status":"publish","type":"post","link":"https:\/\/eptura.com\/discover-more\/blog\/construction-equipment-downtime\/","title":{"rendered":"How To build a PM program for construction equipment"},"content":{"rendered":"<p><span data-contrast=\"auto\">As construction projects grow in complexity and scale, the need for efficient and effective maintenance strategies increases exponentially. Even small delays caused by construction equipment downtime can throw a project off schedule, increasing a wide range of costs. With a comprehensive preventive maintenance (PM) program backed by a modern software solution, construction professionals can reduce the risks connected to breakdowns.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<h2 aria-level=\"2\"><span data-contrast=\"none\">Why is equipment downtime so costly in construction?<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/h2>\n<p><span data-contrast=\"auto\">Downtime equipment in construction is costly because of several interconnected factors.\u00a0<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Idle equipment leads to delayed project timelines, which can result in significant financial penalties and loss of reputation. Each day a project falls behind schedule can translate into extra costs for additional labor, material, and potential contractual fines.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The direct costs of repairing or replacing malfunctioning equipment can also be substantial. Unexpected breakdowns often require emergency repairs, which are typically more expensive than routine maintenance. Additionally, the cost of renting replacement equipment to keep the project on track can further add to expenses.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Equipment downtime disrupts the carefully planned workflow, leading to inefficiencies and reduced productivity. Remember, project management for construction generally follows the traditional waterfall model. Workers may be left idle, waiting for equipment to be repaired, which wastes valuable labor hours. This ripple effect can impact subsequent tasks, causing a domino effect of delays throughout the project.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">And frequent downtime can negatively affect the lifespan of equipment, necessitating earlier replacements and increasing long-term capital expenditures. Regular preventive maintenance is crucial to mitigate these costs by identifying and addressing potential issues before they cause significant downtime. Minimizing equipment downtime isn&#8217;t just about saving money. It&#8217;s about ensuring the overall success and profitability of construction projects.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<h2 aria-level=\"2\"><span data-contrast=\"none\">How can construction companies calculate the true cost of equipment downtime?<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/h2>\n<p><span data-contrast=\"auto\">To calculate the cost of unscheduled downtime for equipment on a construction site, consider lost productivity, repair costs, and additional expenses such as rental equipment or overtime labor.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<p><b><span data-contrast=\"auto\">Lost productivity: <\/span><\/b><span data-contrast=\"auto\">Calculate the hourly output of the equipment and multiply by the hours of downtime.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<p><b><span data-contrast=\"auto\">Repair costs: <\/span><\/b><span data-contrast=\"auto\">Include parts, labor, and any diagnostic fees.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<p><b><span data-contrast=\"auto\">Additional expenses: <\/span><\/b><span data-contrast=\"auto\">Include rental equipment to replace the downed machine plus any overtime labor if workers need to catch up.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">For example, a bulldozer moves 200 cubic yards of dirt per hour. If it&#8217;s down for eight hours, that&#8217;s 1,600 cubic yards not moved. Repairing the bulldozer costs $5,000 in parts and $3,000 in labor. And renting a replacement bulldozer costs $2,000 per day, and overtime labor is $1,500.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559685&quot;:0,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">\u00a0<\/span><\/p>\n<p><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559685&quot;:0,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Lost productivity: 1,600 cubic yards at $2 per cubic yard = $3,200<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Repair costs: $8,000<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Additional expenses: $3,500<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Total cost of unscheduled downtime: $3,200 + $8,000 + $3,500 = $14,700<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">This example is likely a best-case scenario for construction equipment downtime because it does not include the cost of the work delays between the first bulldozer breaking down and the replacement arriving. Once the work is off schedule, every other element of the project needs recalibration to meet an adjusted timeline. So, the rebar might now go in late, and the cement trucks might need to be rescheduled, too.\u00a0<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<h2 aria-level=\"2\"><span data-contrast=\"none\">How can construction companies prevent unplanned downtime with preventive maintenance?<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/h2>\n<p><span data-contrast=\"auto\">A PM program plays an important role in keeping construction equipment online, ensuring longevity, reliability, and cost-effectiveness. Regular inspections allow for early detection of issues, preventing minor problems from escalating into major failures that cause significant downtime. For example, checking a crane&#8217;s hydraulic system can identify leaks or worn hoses, which are inexpensive to fix but could lead to catastrophic failures.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Scheduled maintenance tasks, such as oil changes, filter replacements, and lubrication, keep equipment running smoothly and extend their lifespan. These tasks prevent excessive wear and tear, reducing the need for premature component replacements. For example, regularly changing the engine oil on an excavator can prolong engine life, saving thousands of dollars in potential repair or replacement costs.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">A PM program can also improve safety on construction sites. Well-maintained equipment is less likely to malfunction, reducing the risk of accidents and injuries. Inspections also ensure that safety features, like backup alarms and emergency stops, are functioning correctly.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-37342\" src=\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/08\/Preventive-Maintenance-1.webp\" alt=\"\" width=\"800\" height=\"500\" srcset=\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/08\/Preventive-Maintenance-1.webp 800w, https:\/\/eptura.com\/wp-content\/uploads\/2024\/08\/Preventive-Maintenance-1-300x188.webp 300w, https:\/\/eptura.com\/wp-content\/uploads\/2024\/08\/Preventive-Maintenance-1-768x480.webp 768w\" sizes=\"auto, (max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 984px) 61vw, (max-width: 1362px) 45vw, 600px\" \/><\/p>\n<p><span data-contrast=\"auto\">And well-documented maintenance records can increase resale value, providing a comprehensive history of the equipment&#8217;s condition and upkeep. In summary, preventive maintenance not only saves time and money but also promotes safety and preserves the value of construction equipment.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<h2 aria-level=\"2\"><span data-contrast=\"none\">How does preventive maintenance software help construction companies prevent downtime?<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/h2>\n<p><span data-contrast=\"auto\">PM software helps with streamlining processes and enhancing efficiency. Backed by the right solution, maintenance teams can:<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<ul>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"5\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><b><span data-contrast=\"auto\">Eliminate complicated maintenance workflows<\/span><\/b><span data-contrast=\"auto\">: Automates scheduling, assigns tasks, and tracks progress, reducing manual effort and minimizing errors<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"5\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><b><span data-contrast=\"auto\">Retain valuable knowledge from senior techs<\/span><\/b><span data-contrast=\"auto\">: Captures institutional knowledge by documenting maintenance procedures and historical data, ensuring expertise is saved and shared<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"5\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><b><span data-contrast=\"auto\">Allocate resources seamlessly<\/span><\/b><span data-contrast=\"auto\">: Provides real-time visibility into equipment status and technician availability, enabling dynamic resource allocation and improved productivity<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"5\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><b><span data-contrast=\"auto\">Keep your entire team connected from anywhere<\/span><\/b><span data-contrast=\"auto\">: Offers mobile access, allowing field technicians to update work orders, access documentation, and communicate with the team remotely<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"5\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><b><span data-contrast=\"auto\">Unify your data into a single connected database<\/span><\/b><span data-contrast=\"auto\">: Centralizes equipment history, maintenance records, and inventory data, enabling informed decision-making and simplifying audits<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-contrast=\"auto\">By addressing these aspects, preventive maintenance software helps the maintenance team improve equipment reliability, reduce downtime, and increase operational efficiency.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<h2 aria-level=\"2\"><span data-contrast=\"none\">What are the steps for implementing a PM program in construction?<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/h2>\n<p><span data-contrast=\"auto\">Implementing a PM program requires a systematic approach that incorporates continuous improvement.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<h3 aria-level=\"3\"><span data-contrast=\"none\">Assess current maintenance practices<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/h3>\n<p><span data-contrast=\"auto\">Before implementing a preventive maintenance program, it&#8217;s important to understand your current maintenance practices. Conduct a thorough audit of your existing processes, equipment history, and failure patterns. Identify which assets are most critical to your operations and which are most prone to breakdowns. Also evaluate your current maintenance strategies, including reactive and preventive measures, to determine what&#8217;s working and what&#8217;s not. A thorough assessment helps you pinpoint areas that need improvement and set a baseline for measuring the success of your new program. Additionally, involve your maintenance team in this process to gather their insights and gain buy-in.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<h2 aria-level=\"3\"><span data-contrast=\"none\">Implement a digital PM platform<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/h2>\n<p><span data-contrast=\"auto\">A digital PM platform is the backbone of a modern, efficient maintenance program. Invest in a comprehensive software solution that helps you meet the specific needs of the construction industry. Key features to look for include:<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559685&quot;:0,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<ul>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"6\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"auto\">Equipment tracking<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"6\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"auto\">Automated work order generation<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"6\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"auto\">Maintenance scheduling<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"6\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"auto\">Inventory management<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"6\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"auto\">Real-time analytics<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-contrast=\"auto\">The platform should also offer mobile access, allowing technicians to update work orders and access documentation from the field. To ensure a smooth implementation, appoint a dedicated project manager, involve your information technology department, and look at following a phased rollout. Make sure there\u2019s adequate training so all users are comfortable with the new system.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<h3 aria-level=\"3\"><span data-contrast=\"none\">Develop a maintenance schedule<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/h3>\n<p><span data-contrast=\"auto\">With your digital platform in place, the next step is to develop a maintenance schedule for your equipment. Start by gathering manufacturer recommendations for each asset, including inspection intervals, lubrication requirements, and component replacement schedules. Then, adjust these recommendations based on your equipment&#8217;s actual usage and operating conditions.\u00a0<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-37341\" src=\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/08\/Preventive-maintenance-scheduling-5.webp\" alt=\"\" width=\"800\" height=\"500\" srcset=\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/08\/Preventive-maintenance-scheduling-5.webp 800w, https:\/\/eptura.com\/wp-content\/uploads\/2024\/08\/Preventive-maintenance-scheduling-5-300x188.webp 300w, https:\/\/eptura.com\/wp-content\/uploads\/2024\/08\/Preventive-maintenance-scheduling-5-768x480.webp 768w\" sizes=\"auto, (max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 984px) 61vw, (max-width: 1362px) 45vw, 600px\" \/><\/p>\n<p><span data-contrast=\"auto\">For example, equipment exposed to harsh environments may require more frequent maintenance. Input this schedule into your digital platform, which should automatically generate work orders based on meter readings or calendar intervals. Regularly review and update your maintenance schedules to ensure they remain relevant and effective.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<h3 aria-level=\"3\"><span data-contrast=\"none\">Train the team<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/h3>\n<p><span data-contrast=\"auto\">The success of your program hinges on the support and competence of your team. Provide comprehensive training on the new program, including the digital platform, maintenance schedules, and procedures. Ensure all stakeholders understand their roles and responsibilities, from technicians performing the maintenance tasks to operators reporting equipment issues, and management overseeing the program. It\u2019s important to foster a culture of proactive maintenance, encouraging everyone to take ownership of equipment health. Regularly refresh this training to keep the program top of mind and update your team on any changes to the processes or software.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<h3 aria-level=\"3\"><span data-contrast=\"none\">Monitor, analyze, and optimize<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/h3>\n<p><span data-contrast=\"auto\">Continuous monitoring and analysis are essential to maximize the program&#8217;s benefits. Use your digital platform to track key performance indicators (KPIs) such as equipment downtime, mean time between failures (MTBF), and maintenance costs. Regularly review these metrics to identify trends, pinpoint problem areas, and measure the program&#8217;s effectiveness. Use this data to refine your maintenance strategies, optimize schedules, and improve procedures.\u00a0<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Encourage a cycle of continuous improvement, always looking for ways to improve equipment reliability and reduce maintenance costs. Regularly communicate the program&#8217;s successes and lessons learned to your team to maintain engagement and momentum.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">It\u2019s important to remember that with any maintenance program, implementing the right technology is only ever part of the solution. In an episode of the <\/span><a href=\"https:\/\/eptura.com\/discover-more\/podcast\/dynamic-facilities-planning-and-asset-management-strategies\/\"><span data-contrast=\"none\">Asset Champion podcast<\/span><\/a><span data-contrast=\"auto\">, guest Cameron Christensen, CEFP, FMP, and Director of Asset Management for Facilities Operations at Princeton University, explains how technology is one piece of the puzzle.\u00a0<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">\u201cTechnology is not the strategy. It\u2019s an accelerator of strategy. It\u2019s a very important piece of our strategy, but it\u2019s not the strategy itself.\u201d<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n<h2 aria-level=\"2\"><span data-contrast=\"none\">How does a digital preventive maintenance platform help cut construction equipment downtime?<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/h2>\n<p><span data-contrast=\"auto\">Implementing a modern PM platform helps streamline construction maintenance operations. By automating scheduling, assigning tasks, and tracking progress, the platform helps eliminate complicated workflows, reduces manual effort, and minimizes errors. It helps the maintenance team capture and preserve institutional knowledge from experienced technicians by documenting maintenance procedures and historical data, ensuring expertise is shared. And because it offers mobile access for field technicians to update work orders, access documentation, and communicate remotely, the entire team stays connected, boosting time on wrench and overall productivity.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>With a comprehensive preventive maintenance (PM) program backed by a modern software solution, construction professionals can reduce the risks connected to breakdowns.\u00a0<\/p>\n","protected":false},"author":26,"featured_media":37343,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","inline_featured_image":false,"footnotes":"","_wpscp_schedule_draft_date":"","_wpscp_schedule_republish_date":"","_wpscppro_advance_schedule":false,"_wpscppro_advance_schedule_date":"","_wpscppro_dont_share_socialmedia":null,"_wpscppro_custom_social_share_image":0,"_facebook_share_type":"default","_twitter_share_type":"default","_linkedin_share_type":"default","_pinterest_share_type":"default","_linkedin_share_type_page":"","_instagram_share_type":"default","_medium_share_type":"default","_threads_share_type":"","_google_business_share_type":"","_selected_social_profile":[],"_wpsp_enable_custom_social_template":false,"_wpsp_social_scheduling":{"enabled":false,"datetime":null,"platforms":[],"status":"template_only","dateOption":"today","timeOption":"now","customDays":"","customHours":"","customDate":"","customTime":"","schedulingType":"absolute"},"_wpsp_active_default_template":true},"categories":[1],"tags":[419,361],"class_list":["post-9436","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-eptura","tag-blog","tag-eptura"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.5 (Yoast SEO v26.5) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>How To build a PM program for construction equipment | Eptura<\/title>\n<meta name=\"description\" content=\"With a comprehensive preventive maintenance (PM) program backed by a modern software solution, construction professionals can reduce the risks connected to breakdowns.\u00a0\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/eptura.com\/discover-more\/blog\/construction-equipment-downtime\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How To build a PM program for construction equipment\" \/>\n<meta property=\"og:description\" content=\"With a comprehensive preventive maintenance (PM) program backed by a modern software solution, construction professionals can reduce the risks connected to breakdowns.\u00a0\" \/>\n<meta property=\"og:url\" content=\"https:\/\/eptura.com\/discover-more\/blog\/construction-equipment-downtime\/\" \/>\n<meta property=\"og:site_name\" content=\"Eptura\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/EpturaWork\/\" \/>\n<meta property=\"article:published_time\" content=\"2024-11-22T13:00:23+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-02-19T15:46:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/08\/Young-woman-worker-on-a-construction-site-scaled.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Jonathan Davis\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@epturawork\" \/>\n<meta name=\"twitter:site\" content=\"@epturawork\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jonathan Davis\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":[\"Article\",\"BlogPosting\"],\"@id\":\"https:\/\/eptura.com\/discover-more\/blog\/construction-equipment-downtime\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/eptura.com\/discover-more\/blog\/construction-equipment-downtime\/\"},\"author\":{\"name\":\"Jonathan Davis\",\"@id\":\"https:\/\/eptura.com\/#\/schema\/person\/2e140d3d2f77b87152b5e2ba941b9158\"},\"headline\":\"How To build a PM program for construction equipment\",\"datePublished\":\"2024-11-22T13:00:23+00:00\",\"dateModified\":\"2025-02-19T15:46:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/eptura.com\/discover-more\/blog\/construction-equipment-downtime\/\"},\"wordCount\":1573,\"publisher\":{\"@id\":\"https:\/\/eptura.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/eptura.com\/discover-more\/blog\/construction-equipment-downtime\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/08\/Young-woman-worker-on-a-construction-site-scaled.webp\",\"keywords\":[\"Blog\",\"eptura\"],\"articleSection\":[\"Eptura\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/eptura.com\/discover-more\/blog\/construction-equipment-downtime\/\",\"url\":\"https:\/\/eptura.com\/discover-more\/blog\/construction-equipment-downtime\/\",\"name\":\"How To build a PM program for construction equipment | Eptura\",\"isPartOf\":{\"@id\":\"https:\/\/eptura.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/eptura.com\/discover-more\/blog\/construction-equipment-downtime\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/eptura.com\/discover-more\/blog\/construction-equipment-downtime\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/08\/Young-woman-worker-on-a-construction-site-scaled.webp\",\"datePublished\":\"2024-11-22T13:00:23+00:00\",\"dateModified\":\"2025-02-19T15:46:42+00:00\",\"description\":\"With a comprehensive preventive maintenance (PM) program backed by a modern software solution, construction professionals can reduce the risks connected to breakdowns.\u00a0\",\"breadcrumb\":{\"@id\":\"https:\/\/eptura.com\/discover-more\/blog\/construction-equipment-downtime\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/eptura.com\/discover-more\/blog\/construction-equipment-downtime\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/eptura.com\/discover-more\/blog\/construction-equipment-downtime\/#primaryimage\",\"url\":\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/08\/Young-woman-worker-on-a-construction-site-scaled.webp\",\"contentUrl\":\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/08\/Young-woman-worker-on-a-construction-site-scaled.webp\",\"width\":2560,\"height\":1707},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/eptura.com\/discover-more\/blog\/construction-equipment-downtime\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/eptura.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How To build a PM program for construction equipment\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/eptura.com\/#website\",\"url\":\"https:\/\/eptura.com\/\",\"name\":\"Eptura\",\"description\":\"Work your world\",\"publisher\":{\"@id\":\"https:\/\/eptura.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/eptura.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/eptura.com\/#organization\",\"name\":\"Eptura\",\"url\":\"https:\/\/eptura.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/eptura.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/03\/eptura-dark-svg-TM-8.png\",\"contentUrl\":\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/03\/eptura-dark-svg-TM-8.png\",\"width\":1280,\"height\":800,\"caption\":\"Eptura\"},\"image\":{\"@id\":\"https:\/\/eptura.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/EpturaWork\/\",\"https:\/\/x.com\/epturawork\",\"https:\/\/www.linkedin.com\/company\/eptura\/\",\"https:\/\/twitter.com\/epturawork\",\"https:\/\/www.youtube.com\/channel\/UC6hdVbsn41BZxfIYmPUdCWQ\"],\"description\":\"A global worktech company that provides software solutions for workplaces, people, and assets that enable everyone to reach their full potential.\",\"legalName\":\"Eptura\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/eptura.com\/#\/schema\/person\/2e140d3d2f77b87152b5e2ba941b9158\",\"name\":\"Jonathan Davis\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/eptura.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/02\/jonathan_davis-96x96.png\",\"contentUrl\":\"https:\/\/eptura.com\/wp-content\/uploads\/2024\/02\/jonathan_davis-96x96.png\",\"caption\":\"Jonathan Davis\"},\"description\":\"As a content creator at Eptura, Jonathan Davis covers asset management, maintenance software, and SaaS solutions, delivering thought leadership with actionable insights across industries such as fleet, manufacturing, healthcare, and hospitality. Jonathan\u2019s writing focuses on topics to help enterprises optimize their operations, including building lifecycle management, digital twins, BIM for facility management, and preventive and predictive maintenance strategies. With a master's degree in journalism and a diverse background that includes writing textbooks, editing video game dialogue, and teaching English as a foreign language, Jonathan brings a versatile perspective to his content creation.\",\"sameAs\":[\"https:\/\/www.linkedin.com\/in\/jonathan-t-davis\/\"],\"jobTitle\":\"Senior Content Writer\",\"worksFor\":\"Eptura\",\"url\":\"https:\/\/eptura.com\/discover-more\/blog\/author\/jonathan-davis\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"How To build a PM program for construction equipment | Eptura","description":"With a comprehensive preventive maintenance (PM) program backed by a modern software solution, construction professionals can reduce the risks connected to breakdowns.\u00a0","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/eptura.com\/discover-more\/blog\/construction-equipment-downtime\/","og_locale":"en_US","og_type":"article","og_title":"How To build a PM program for construction equipment","og_description":"With a comprehensive preventive maintenance (PM) program backed by a modern software solution, construction professionals can reduce the risks connected to breakdowns.\u00a0","og_url":"https:\/\/eptura.com\/discover-more\/blog\/construction-equipment-downtime\/","og_site_name":"Eptura","article_publisher":"https:\/\/www.facebook.com\/EpturaWork\/","article_published_time":"2024-11-22T13:00:23+00:00","article_modified_time":"2025-02-19T15:46:42+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/eptura.com\/wp-content\/uploads\/2024\/08\/Young-woman-worker-on-a-construction-site-scaled.webp","type":"image\/webp"}],"author":"Jonathan Davis","twitter_card":"summary_large_image","twitter_creator":"@epturawork","twitter_site":"@epturawork","twitter_misc":{"Written by":"Jonathan Davis","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":["Article","BlogPosting"],"@id":"https:\/\/eptura.com\/discover-more\/blog\/construction-equipment-downtime\/#article","isPartOf":{"@id":"https:\/\/eptura.com\/discover-more\/blog\/construction-equipment-downtime\/"},"author":{"name":"Jonathan Davis","@id":"https:\/\/eptura.com\/#\/schema\/person\/2e140d3d2f77b87152b5e2ba941b9158"},"headline":"How To build a PM program for construction equipment","datePublished":"2024-11-22T13:00:23+00:00","dateModified":"2025-02-19T15:46:42+00:00","mainEntityOfPage":{"@id":"https:\/\/eptura.com\/discover-more\/blog\/construction-equipment-downtime\/"},"wordCount":1573,"publisher":{"@id":"https:\/\/eptura.com\/#organization"},"image":{"@id":"https:\/\/eptura.com\/discover-more\/blog\/construction-equipment-downtime\/#primaryimage"},"thumbnailUrl":"https:\/\/eptura.com\/wp-content\/uploads\/2024\/08\/Young-woman-worker-on-a-construction-site-scaled.webp","keywords":["Blog","eptura"],"articleSection":["Eptura"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/eptura.com\/discover-more\/blog\/construction-equipment-downtime\/","url":"https:\/\/eptura.com\/discover-more\/blog\/construction-equipment-downtime\/","name":"How To build a PM program for construction equipment | Eptura","isPartOf":{"@id":"https:\/\/eptura.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/eptura.com\/discover-more\/blog\/construction-equipment-downtime\/#primaryimage"},"image":{"@id":"https:\/\/eptura.com\/discover-more\/blog\/construction-equipment-downtime\/#primaryimage"},"thumbnailUrl":"https:\/\/eptura.com\/wp-content\/uploads\/2024\/08\/Young-woman-worker-on-a-construction-site-scaled.webp","datePublished":"2024-11-22T13:00:23+00:00","dateModified":"2025-02-19T15:46:42+00:00","description":"With a comprehensive preventive maintenance (PM) program backed by a modern software solution, construction professionals can reduce the risks connected to breakdowns.\u00a0","breadcrumb":{"@id":"https:\/\/eptura.com\/discover-more\/blog\/construction-equipment-downtime\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/eptura.com\/discover-more\/blog\/construction-equipment-downtime\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eptura.com\/discover-more\/blog\/construction-equipment-downtime\/#primaryimage","url":"https:\/\/eptura.com\/wp-content\/uploads\/2024\/08\/Young-woman-worker-on-a-construction-site-scaled.webp","contentUrl":"https:\/\/eptura.com\/wp-content\/uploads\/2024\/08\/Young-woman-worker-on-a-construction-site-scaled.webp","width":2560,"height":1707},{"@type":"BreadcrumbList","@id":"https:\/\/eptura.com\/discover-more\/blog\/construction-equipment-downtime\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/eptura.com\/"},{"@type":"ListItem","position":2,"name":"How To build a PM program for construction equipment"}]},{"@type":"WebSite","@id":"https:\/\/eptura.com\/#website","url":"https:\/\/eptura.com\/","name":"Eptura","description":"Work your world","publisher":{"@id":"https:\/\/eptura.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/eptura.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/eptura.com\/#organization","name":"Eptura","url":"https:\/\/eptura.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eptura.com\/#\/schema\/logo\/image\/","url":"https:\/\/eptura.com\/wp-content\/uploads\/2024\/03\/eptura-dark-svg-TM-8.png","contentUrl":"https:\/\/eptura.com\/wp-content\/uploads\/2024\/03\/eptura-dark-svg-TM-8.png","width":1280,"height":800,"caption":"Eptura"},"image":{"@id":"https:\/\/eptura.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/EpturaWork\/","https:\/\/x.com\/epturawork","https:\/\/www.linkedin.com\/company\/eptura\/","https:\/\/twitter.com\/epturawork","https:\/\/www.youtube.com\/channel\/UC6hdVbsn41BZxfIYmPUdCWQ"],"description":"A global worktech company that provides software solutions for workplaces, people, and assets that enable everyone to reach their full potential.","legalName":"Eptura"},{"@type":"Person","@id":"https:\/\/eptura.com\/#\/schema\/person\/2e140d3d2f77b87152b5e2ba941b9158","name":"Jonathan Davis","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eptura.com\/#\/schema\/person\/image\/","url":"https:\/\/eptura.com\/wp-content\/uploads\/2024\/02\/jonathan_davis-96x96.png","contentUrl":"https:\/\/eptura.com\/wp-content\/uploads\/2024\/02\/jonathan_davis-96x96.png","caption":"Jonathan Davis"},"description":"As a content creator at Eptura, Jonathan Davis covers asset management, maintenance software, and SaaS solutions, delivering thought leadership with actionable insights across industries such as fleet, manufacturing, healthcare, and hospitality. Jonathan\u2019s writing focuses on topics to help enterprises optimize their operations, including building lifecycle management, digital twins, BIM for facility management, and preventive and predictive maintenance strategies. With a master's degree in journalism and a diverse background that includes writing textbooks, editing video game dialogue, and teaching English as a foreign language, Jonathan brings a versatile perspective to his content creation.","sameAs":["https:\/\/www.linkedin.com\/in\/jonathan-t-davis\/"],"jobTitle":"Senior Content Writer","worksFor":"Eptura","url":"https:\/\/eptura.com\/discover-more\/blog\/author\/jonathan-davis\/"}]}},"_links":{"self":[{"href":"https:\/\/eptura.com\/wp-json\/wp\/v2\/posts\/9436","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eptura.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eptura.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eptura.com\/wp-json\/wp\/v2\/users\/26"}],"replies":[{"embeddable":true,"href":"https:\/\/eptura.com\/wp-json\/wp\/v2\/comments?post=9436"}],"version-history":[{"count":0,"href":"https:\/\/eptura.com\/wp-json\/wp\/v2\/posts\/9436\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eptura.com\/wp-json\/wp\/v2\/media\/37343"}],"wp:attachment":[{"href":"https:\/\/eptura.com\/wp-json\/wp\/v2\/media?parent=9436"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eptura.com\/wp-json\/wp\/v2\/categories?post=9436"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eptura.com\/wp-json\/wp\/v2\/tags?post=9436"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}